Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Main Street Roof Replacement

IKO Dynasty Roof Replacement — Alton, IL 62002

A completed project on Main Street in Alton, IL 62002 — 21.33 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Alton
IKO DynastyIKO Dynasty · IKO · 21.33 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Main Street in Alton, IL 62002, finishing July 20, 2026. 21.33 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

Our crew finished a 21.33-square roof (2,133 square feet), about what a standard ranch house carries on Main Street in Alton, IL on Monday, July 20. Alton is a Madison County river city on the bluffs above the Mississippi, with a deep stock of older homes. It was one of 11 roof replacements our crews completed in Alton in July 2026. IKO Dynasty went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.

What the work order shows

LocationMain Street (Alton, IL 62002)
CompletedMonday, July 20, 2026
Opened to completed27 days
Roof size21.33 squares (about 2,133 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL062326032

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

Materials installed, layer by layer

Dynasty is IKO's performance architectural shingle. Its signature is ArmourZone, a reinforced fabric strip across the nailing area that gives every nail a wide, tough landing spot. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

Who did the work

John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (June 23, 2026) to the day the crew finished (July 20, 2026) took 27 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Alton?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Alton roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

27 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Does John Beal Roofing work in Alton, IL?

Yes. Alton is served by our St. Louis office, and we've completed 11 roof replacements there in the last few months alone. Call 314-429-6000 for a free inspection.

Who do I call about a roof in Alton?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

More recent projects nearby

Call 1-800-564-6232Free Inspection