IKO Dynasty Roof Replacement — Ballwin, MO 63021

A completed project on Chamberlin Drive in Ballwin, MO 63021 — 33.33 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Ballwin
IKO DynastyIKO Dynasty · IKO · 33.33 squares · Roof replacement

At a glance: Completed June 19, 2026: a full tear-off and replacement on Chamberlin Drive, Ballwin, MO. Shingle: IKO Dynasty. Size: 33.33 squares. Underlayment: synthetic underlayment across the full deck. Office: St. Louis, 314-429-6000.

On Chamberlin Drive in Ballwin, MO (a West County suburb along the Manchester Road corridor), the crew tore off and replaced a 33.33-square roof, the size of a larger ranch or a modest two-story. It was one of 7 roof replacements our crews completed in Ballwin in June 2026. IKO Dynasty went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.

Job specs

LocationChamberlin Drive (Ballwin, MO 63021)
CompletedFriday, June 19, 2026
Opened to completed23 days
Roof size33.33 squares (about 3,333 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL052726009

Choosing a color for your own roof? Browse every IKO Dynasty color on a whole-house preview in our IKO Dynasty color selector.

Materials installed, layer by layer

IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • IKO Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

Who did the work

John Beal Roofing crews out of our St. Louis office installed this roof. The job was opened in our system on May 27, 2026 and the crew finished on June 19, 2026, 23 days later. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Ballwin?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Questions homeowners ask about this project

What shingle was installed on this Ballwin roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

How long did this project take from start to finish?

23 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Ballwin?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.