OC Duration Roof Replacement — Belleville, IL 62221

A completed project on Edbrooke Drive in Belleville, IL 62221 — 30.67 squares of Owens Corning OC Duration, installed by John Beal Roofing. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Belleville
OC DurationOC Duration · Owens Corning · 30.67 squares · Roof replacement

At a glance: Completed October 22, 2026: a full tear-off and replacement on Edbrooke Drive, Belleville, IL. Shingle: OC Duration. Size: 30.67 squares. Underlayment: synthetic underlayment across the full deck. Office: St. Louis, 314-429-6000.

On Edbrooke Drive in Belleville, IL (the St. Clair County seat on the Illinois side of the metro), the crew tore off and replaced a mid-size 30.67-square roof, roughly 3,067 square feet. It was one of 7 roof replacements our crews completed in Belleville in October 2026. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and OC Duration on top.

What the work order shows

LocationEdbrooke Drive (Belleville, IL 62221)
CompletedThursday, October 22, 2026
Opened to completed40 days
Roof size30.67 squares (about 3,067 sq ft)
Scope of workFull tear-off and roof replacement
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterIce & water membrane
Starter courseFactory starter
Hip & ridgeOwens Corning Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL091226013

Want to see what OC Duration looks like on a whole house? Try every color in our OC Duration color selector.

Materials installed, layer by layer

Owens Corning TruDefinition Duration uses SureNail Technology, a woven strip across the nailing zone that gives the fasteners something to grab and helps the shingle stay down in high wind. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • Factory starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • Owens Corning Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

Who did the work

John Beal Roofing crews out of our St. Louis office installed this roof. The job was opened in our system on September 12, 2026 and the crew finished on October 22, 2026, 40 days later. We’ve been family-owned since 1947, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Belleville?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Questions homeowners ask about this project

What shingle was installed on this Belleville roof?

Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Ice and water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

How big was the roof on Edbrooke Drive?

30.67 squares, or about 3,067 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

How long did this project take from start to finish?

40 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Belleville?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.