Get Your Ballpark Price
Home › Recent Projects › Creve Coeur Chamblee Lane Roof Replacement

GAF Timberline HDZ Roof Replacement — Creve Coeur, MO 63141

A completed project on Chamblee Lane in Creve Coeur, MO 63141 — 50.00 squares of GAF GAF Timberline HDZ, installed by John Beal Roofing. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

GAF Timberline HDZ shingle line as installed in Creve Coeur
GAF Timberline HDZGAF Timberline HDZ · GAF · 50.00 squares · Roof replacement

At a glance: In short: 50.00 squares, GAF Timberline HDZ, synthetic underlayment across the full deck, ridge vent, lifetime workmanship warranty. Chamblee Lane, Creve Coeur, MO 63141, done October 5, 2026 by our St. Louis crew (314-429-6000).

This one was a large 50.00-square roof covering about 5,000 square feet on Chamblee Lane in Creve Coeur, MO, a West County city along Olive Boulevard. It was one of 3 roof replacements our crews completed in Creve Coeur in October 2026. On top: GAF Timberline HDZ. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

Project record

LocationChamblee Lane (Creve Coeur, MO 63141)
CompletedMonday, October 5, 2026
Opened to completed124 days
Roof size50.00 squares (about 5,000 sq ft)
Scope of workFull tear-off and roof replacement
ShingleGAF — GAF Timberline HDZ
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeGAF Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL060326024

Want to see what GAF Timberline HDZ looks like on a whole house? Try every color in our GAF Timberline HDZ color selector.

The roofing system on this house

Timberline HDZ is GAF's architectural shingle with a wide StrikeZone nailing area and LayerLock Technology holding the two layers of the shingle together, so fasteners land where they hold best. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • IKO Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • GAF Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

Who installed it

John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (June 3, 2026) to the day the crew finished (October 5, 2026) took 124 days. We’ve been family-owned since 1947, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Creve Coeur?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Questions homeowners ask about this project

What shingle was installed on this Creve Coeur roof?

GAF GAF Timberline HDZ, over synthetic underlayment across the full deck. The full system is in the project details table above.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

124 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

How big was the roof on Chamblee Lane?

50.00 squares, or about 5,000 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

Who do I call about a roof in Creve Coeur?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection