Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Holiday Drive Roof Replacement

Shasta White Roof Replacement — Edwardsville, IL 62025

A completed project on Holiday Drive in Edwardsville, IL 62025 — 33.00 squares of OC Duration in Shasta White, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Edwardsville
Shasta WhiteOC Duration · Owens Corning · 33.00 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Holiday Drive in Edwardsville, IL 62025, finishing May 12, 2026. 33.00 squares of Owens Corning OC Duration, color Shasta White, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

This one was a 33.00-square roof, the size of a larger ranch or a modest two-story on Holiday Drive in Edwardsville, IL, the Madison County seat, home to SIUE. The crew wrapped it up on Tuesday, May 12. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and OC Duration in Shasta White on top.

Project details

LocationHoliday Drive (Edwardsville, IL 62025)
CompletedTuesday, May 12, 2026
Opened to completed43 days
Roof size33.00 squares (about 3,300 sq ft)
Scope of workFull tear-off and roof replacement
Shingle colorShasta White (as recorded on the work order)
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseOC Starter
Hip & ridgeOC ProEdge Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL033026003

The color on this roof

The work order lists the color as Shasta White. That name isn’t in our Owens Corning TruDefinition Duration color gallery, so we’re not showing a swatch that might be the wrong one. The image above is the shingle line itself. Your project manager can bring a full-size sample of any color out to your house. You can also browse every OC Duration color here.

What went on this roof

The feature that defines Owens Corning Duration is SureNail Technology, a tough woven fabric band in the nailing zone that the fasteners go through for better hold. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • OC ProEdge Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

Who did the work

This was a St. Louis office job, installed by our own crew, not subcontracted out. The job was opened in our system on March 30, 2026 and the crew finished on May 12, 2026, 43 days later. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Edwardsville?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Edwardsville roof?

Owens Corning OC Duration in Shasta White, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

What color is the roof on Holiday Drive?

Shasta White, from the OC Duration line. It's listed as recorded on the work order.

How long did this project take from start to finish?

43 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Edwardsville?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Edwardsville

Call 1-800-564-6232Free Inspection