At a glance: In short: 39.67 squares, GAF Royal Sovereign, 15 lb felt underlayment, ridge vent, lifetime workmanship warranty. Lake Pointe Court, Freeburg, IL 62243, done October 14, 2026 by our St. Louis crew (314-429-6000).
Our crew finished a big 39.67-square roof, about 3,967 square feet of surface on Lake Pointe Court in Freeburg, IL on Wednesday, October 14. Freeburg is a St. Clair County village southeast of Belleville. The crew wrapped it up on Wednesday, October 14. The system: 15 lb felt underlayment, ice and water membrane in the valleys and at the eaves, and GAF Royal Sovereign on top.
What the work order shows
| Location | Lake Pointe Court (Freeburg, IL 62243) |
|---|---|
| Completed | Wednesday, October 14, 2026 |
| Opened to completed | 36 days |
| Roof size | 39.67 squares (about 3,967 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | GAF — GAF Royal Sovereign |
| Underlayment | 15 lb felt |
| Ice & water | Ice & water membrane |
| Starter course | Factory starter |
| Hip & ridge | GAF Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL090826048 |
Choosing a color for your own roof? Browse every GAF Royal Sovereign color on a whole-house preview in our GAF Royal Sovereign color selector.
What went on this roof
GAF Royal Sovereign is a traditional three-tab shingle, a flat, uniform look that suits smaller sections, outbuildings and homes originally built with three-tab. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:
- 15 lb felt underlayment. Felt went down over the deck under the shingles.
- Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
- Factory starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- GAF Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
- Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.
The crew behind this roof
The crew came out of our St. Louis office. From the day the job was opened (September 8, 2026) to the day the crew finished (October 14, 2026) took 36 days. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. We answer the phone around the clock, storms included. See 24/7 emergency service.
Need a roof in Freeburg?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
Questions homeowners ask about this project
What shingle was installed on this Freeburg roof?
GAF GAF Royal Sovereign, over 15 lb felt underlayment. The full system is in the project details table above.
What kind of ventilation went on this roof?
A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.
How long did this project take from start to finish?
36 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Was ice and water shield installed?
Yes. Ice and water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
Who do I call about a roof in Freeburg?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

