Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon West Mason Street Roof Replacement

IKO Dynasty Roof Replacement — Grafton, IL 62037

A completed project on West Mason Street in Grafton, IL 62037 — 31.33 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Grafton
IKO DynastyIKO Dynasty · IKO · 31.33 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on West Mason Street in Grafton, IL 62037, finishing May 15, 2026. 31.33 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

Our crew finished a 31.33-square roof, the size of a larger ranch or a modest two-story on West Mason Street in Grafton, IL on Friday, May 15. Grafton is a Jersey County river town where the Illinois River meets the Mississippi. Crews closed it out on May 15, 2026. IKO Dynasty went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.

What the work order shows

LocationWest Mason Street (Grafton, IL 62037)
CompletedFriday, May 15, 2026
Opened to completed31 days
Roof size31.33 squares (about 3,133 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL041426008

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

Materials installed, layer by layer

With IKO Dynasty, the detail that matters most is the ArmourZone nailing strip: a wider, reinforced band where the nails go, so fasteners land where they hold best. The shingle is only the top layer. Here’s the full system that went on this house:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

Who installed it

John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (April 14, 2026) to the day the crew finished (May 15, 2026) took 31 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Grafton?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

FAQ about this roof

What shingle was installed on this Grafton roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

Does John Beal Roofing work in Grafton, IL?

Yes. Grafton is served by our St. Louis office. Call 314-429-6000 for a free inspection.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

31 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Do you publish the customer's address?

No. We publish the street name, city and ZIP so you can see we really work in your neighborhood. We leave off the house number and never publish a customer's name.

Who do I call about a roof in Grafton?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection