Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Hermitage Drive Roof Replacement

OC Duration Roof Replacement — Imperial, MO 63052

A completed project on Hermitage Drive in Imperial, MO 63052 — 64.00 squares of OC Duration in OC Duration, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Imperial
OC DurationOC Duration · Owens Corning · 64.00 squares · Roof replacement

At a glance: Completed June 19, 2026: a full tear-off and replacement on Hermitage Drive, Imperial, MO. Shingle: OC Duration. Size: 64.00 squares. Underlayment: synthetic underlayment across the full deck. Office: St. Louis, 314-429-6000.

Our crew finished a very large 64.00-square project, about 6,400 square feet of roof and several times the size of an average house on Hermitage Drive in Imperial, MO on Friday, June 19. Imperial is a Jefferson County community along I-55. At 64.00 squares it was the second-largest of the 91 roof replacements we completed in June. On top: Owens Corning Duration. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

What the work order shows

LocationHermitage Drive (Imperial, MO 63052)
CompletedFriday, June 19, 2026
Opened to completed371 days
Roof size64.00 squares (about 6,400 sq ft)
Scope of workFull tear-off and roof replacement
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseOC Starter
Hip & ridgeOC ProEdge Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL061325026

Want to see what OC Duration looks like on a whole house? Try every color in our OC Duration color selector.

Materials installed, layer by layer

Owens Corning TruDefinition Duration uses SureNail Technology, a woven strip across the nailing zone that gives the fasteners something to grab and helps the shingle stay down in high wind. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • OC ProEdge Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

The crew came out of our St. Louis office. The job was opened in our system on June 13, 2025 and the crew finished on June 19, 2026, 371 days later. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Imperial?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Questions homeowners ask about this project

What shingle was installed on this Imperial roof?

Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.

How big was the roof on Hermitage Drive?

64.00 squares, or about 6,400 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

How long did this project take from start to finish?

371 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

Who do I call about a roof in Imperial?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection