Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon South Liberty Street Roof Replacement

IKO Dynasty Roof Replacement — Jerseyville, IL 62052

A completed project on South Liberty Street in Jerseyville, IL 62052 — 19.33 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Jerseyville
IKO DynastyIKO Dynasty · IKO · 19.33 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on South Liberty Street in Jerseyville, IL 62052, finishing June 29, 2026. 19.33 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

This one was a 19.33-square roof, right around the size of a typical single-story ranch on South Liberty Street in Jerseyville, IL, the Jersey County seat, north of Alton in Illinois river country. It was one of 9 roof replacements our crews completed in Jerseyville in June 2026. IKO Dynasty went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.

What the work order shows

LocationSouth Liberty Street (Jerseyville, IL 62052)
CompletedMonday, June 29, 2026
Opened to completed61 days
Roof size19.33 squares (about 1,933 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL042926016

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

What went on this roof

Dynasty is IKO's performance architectural shingle. Its signature is ArmourZone, a reinforced fabric strip across the nailing area that gives every nail a wide, tough landing spot. The shingle is only the top layer. Here’s the full system that went on this house:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • IKO Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

Who installed it

John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (April 29, 2026) to the day the crew finished (June 29, 2026) took 61 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Jerseyville?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Jerseyville roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

61 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

Who do I call about a roof in Jerseyville?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Jerseyville

Call 1-800-564-6232Free Inspection