Get Your Ballpark Price
Home › Recent Projects › Kansas City Locust Avenue Roof Replacement

GAF Timberline HDZ Roof Replacement — Kansas City, KS 66106

A completed project on Locust Avenue in Kansas City, KS 66106 — 15.67 squares of GAF GAF Timberline HDZ, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

GAF Timberline HDZ shingle line as installed in Kansas City
GAF Timberline HDZGAF Timberline HDZ · GAF · 15.67 squares · Roof replacement

At a glance: Completed September 16, 2026: a full tear-off and replacement on Locust Avenue, Kansas City, KS. Shingle: GAF Timberline HDZ. Size: 15.67 squares. Underlayment: synthetic underlayment across the full deck. Office: Kansas City, 816-572-9500.

Our crew finished a 15.67-square roof (1,567 square feet), about what a standard ranch house carries on Locust Avenue in Kansas City, KS on Wednesday, September 16. Kansas City is Wyandotte County, on the Kansas side of the state line. It was one of 3 roof replacements our crews completed in Kansas City in September 2026. On top: GAF Timberline HDZ. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

Project record

LocationLocust Avenue (Kansas City, KS 66106)
CompletedWednesday, September 16, 2026
Opened to completed19 days
Roof size15.67 squares (about 1,567 sq ft)
Scope of workFull tear-off and roof replacement
ShingleGAF — GAF Timberline HDZ
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseGAF Starter
Hip & ridgeGAF Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberKC082826021

Choosing a color for your own roof? Browse every GAF Timberline HDZ color on a whole-house preview in our GAF Timberline HDZ color selector.

The roofing system on this house

GAF Timberline HDZ is a laminated architectural shingle built with GAF LayerLock Technology, which bonds the shingle layers together, and a wide StrikeZone nailing area that gives the installer a large, clearly marked target. The shingle is only the top layer. Here’s the full system that went on this house:

  • A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • GAF Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • GAF Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

John Beal Roofing crews out of our Kansas City office installed this roof. From the day the job was opened (August 28, 2026) to the day the crew finished (September 16, 2026) took 19 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Kansas City?

Free inspection, documented slope by slope, no obligation. Kansas City office: 816-572-9500

Get My Free InspectionCall Kansas City — 816-572-9500

Common questions about this job

What shingle was installed on this Kansas City roof?

GAF GAF Timberline HDZ, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

How long did this project take from start to finish?

19 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

How big was the roof on Locust Avenue?

15.67 squares, or about 1,567 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

Who do I call about a roof in Kansas City?

Our Kansas City office at 816-572-9500. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Kansas City

Call 1-800-564-6232Free Inspection