At a glance: In short: 21.67 squares, OC Supreme, 15 lb felt underlayment, ridge vent, lifetime workmanship warranty. Crossington Lane, Maryville, IL 62062, done October 29, 2026 by our St. Louis crew (314-429-6000).
A 21.67-square roof, right around the size of a typical single-story ranch on Crossington Lane in Maryville, IL, a Madison County village between Collinsville and Glen Carbon. It was our only Maryville roof of October. OC Supreme went over 15 lb felt underlayment, with ice and water membrane at the eaves and valleys.
Job specs
| Location | Crossington Lane (Maryville, IL 62062) |
|---|---|
| Completed | Thursday, October 29, 2026 |
| Opened to completed | 73 days |
| Roof size | 21.67 squares (about 2,167 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | Owens Corning — OC Supreme |
| Underlayment | 15 lb felt |
| Ice & water | Alco Ice & Water |
| Starter course | OC Starter |
| Hip & ridge | OC ProEdge Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL081726037 |
Want to see what OC Supreme looks like on a whole house? Try every color in our OC Supreme color selector.
The roofing system on this house
Supreme is Owens Corning's three-tab shingle: a flat, even pattern that matches older three-tab roofs and works well on garages and small sections. The shingle is only the top layer. Here’s the full system that went on this house:
- 15 lb felt underlayment. Felt went down over the deck under the shingles.
- Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
- OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- OC ProEdge Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
- Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.
Who did the work
John Beal Roofing crews out of our St. Louis office installed this roof. The job was opened in our system on August 17, 2026 and the crew finished on October 29, 2026, 73 days later. We’ve been family-owned since 1947, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.
Need a roof in Maryville?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
FAQ about this roof
What shingle was installed on this Maryville roof?
Owens Corning OC Supreme, over 15 lb felt underlayment. The full system is in the project details table above.
How long did this project take from start to finish?
73 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
What kind of ventilation went on this roof?
A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.
Was ice and water shield installed?
Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
Who do I call about a roof in Maryville?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

