At a glance: John Beal Roofing replaced the roof on Saint Francis Lane in Saint Ann, MO 63074, finishing May 26, 2026. 10.33 squares of IKO IKO Dynasty, color Frostone Grey, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).
Our crew finished a smaller 10.33-square roof covering roughly 1,033 square feet on Saint Francis Lane in Saint Ann, MO on Tuesday, May 26. Saint Ann is a small North County city next to Lambert airport. We replaced 1 other roof in ZIP 63074 that same month. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and IKO Dynasty in Frostone Grey on top.
Job specs
| Location | Saint Francis Lane (Saint Ann, MO 63074) |
|---|---|
| Completed | Tuesday, May 26, 2026 |
| Opened to completed | 33 days |
| Roof size | 10.33 squares (about 1,033 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle color | Frostone Grey |
| Shingle | IKO — IKO Dynasty |
| Underlayment | JBI Synthetic |
| Ice & water | Alco Ice & Water |
| Starter course | IKO Starter |
| Hip & ridge | IKO Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL042326013 |
See Frostone Grey on a whole house, plus every other IKO Dynasty color, in our IKO Dynasty color selector.
The color on this roof: Frostone Grey
The homeowner picked Frostone Grey from the IKO Dynasty line. The swatch above is the manufacturer’s image of that blend. On a real roof it will read a little different depending on pitch, which way each slope faces and how much sun it gets. Frostone Grey has been one of the more popular picks lately: it went on 47 of the roofs in this recent-projects set. Our project managers bring real samples to the house so you can see them next to your brick, siding and trim.
Materials installed, layer by layer
IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:
- Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
- Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
- IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
- IKO Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
- Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.
Who did the work
John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (April 23, 2026) to the day the crew finished (May 26, 2026) took 33 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.
Need a roof in Saint Ann?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
Questions homeowners ask about this project
What shingle was installed on this Saint Ann roof?
IKO IKO Dynasty in Frostone Grey, over synthetic underlayment across the full deck. The full system is in the project details table above.
Was ice and water shield installed?
Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
How big was the roof on Saint Francis Lane?
10.33 squares, or about 1,033 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.
How long did this project take from start to finish?
33 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Who do I call about a roof in Saint Ann?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

