At a glance: In short: 26.33 squares, IKO Dynasty, color Frostone Grey, synthetic underlayment across the full deck, ridge vent, lifetime workmanship warranty. Running Waters Drive, Saint Charles, MO 63304, done September 8, 2026 by our St. Louis crew (314-429-6000).
On Running Waters Drive in Saint Charles, MO (the St. Charles County seat on the Missouri River, where subdivisions run from 1970s split-levels to newer two-story builds), the crew tore off and replaced a 26.33-square roof, the size of a larger ranch or a modest two-story. It was one of 7 roof replacements our crews completed in Saint Charles in September 2026. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and IKO Dynasty in Frostone Grey on top.
What the work order shows
| Location | Running Waters Drive (Saint Charles, MO 63304) |
|---|---|
| Completed | Tuesday, September 8, 2026 |
| Opened to completed | 92 days |
| Roof size | 26.33 squares (about 2,633 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle color | Frostone Grey |
| Shingle | IKO — IKO Dynasty |
| Underlayment | JBI Synthetic |
| Ice & water | Alco Ice & Water |
| Starter course | IKO Starter |
| Hip & ridge | IKO Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL060826049 |
See Frostone Grey on a whole house, plus every other IKO Dynasty color, in our IKO Dynasty color selector.
Why this house went with Frostone Grey
Frostone Grey is part of the IKO Dynasty color lineup. Keep in mind a swatch is a starting point. On the roof, the color shifts with the angle of the sun, the pitch and what’s around it. Frostone Grey has been one of the more popular picks lately: it went on 51 of the roofs in this recent-projects set. Our project managers bring real samples to the house so you can see them next to your brick, siding and trim.
The roofing system on this house
With IKO Dynasty, the detail that matters most is the ArmourZone nailing strip: a wider, reinforced band where the nails go, so fasteners land where they hold best. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:
- Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
- Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
- IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
- IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
- Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.
Who installed it
John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (June 8, 2026) to the day the crew finished (September 8, 2026) took 92 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.
Need a roof in Saint Charles?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
Common questions about this job
What shingle was installed on this Saint Charles roof?
IKO IKO Dynasty in Frostone Grey, over synthetic underlayment across the full deck. The full system is in the project details table above.
How big was the roof on Running Waters Drive?
26.33 squares, or about 2,633 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.
What color is the roof on Running Waters Drive?
Frostone Grey, from the IKO Dynasty line. You can see it on a full house in our color selector.
How long did this project take from start to finish?
92 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Who do I call about a roof in Saint Charles?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

