Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Yankee Drive Roof Replacement

OC Duration Roof Replacement — Saint Charles, MO 63303

A completed project on Yankee Drive in Saint Charles, MO 63303 — 18.67 squares of OC Duration in OC Duration, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Saint Charles
OC DurationOC Duration · Owens Corning · 18.67 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Yankee Drive in Saint Charles, MO 63303, finishing July 7, 2026. 18.67 squares of Owens Corning OC Duration, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

On Yankee Drive in Saint Charles, MO (the St. Charles County seat on the Missouri River, where subdivisions run from 1970s split-levels to newer two-story builds), the crew tore off and replaced a 18.67-square roof (1,867 square feet), about what a standard ranch house carries. It was one of 3 roof replacements our crews completed in Saint Charles in July 2026. On top: Owens Corning Duration. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

Job specs

LocationYankee Drive (Saint Charles, MO 63303)
CompletedTuesday, July 7, 2026
Opened to completed50 days
Roof size18.67 squares (about 1,867 sq ft)
Scope of workFull tear-off and roof replacement
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseOC Starter
Hip & ridgeOC ProEdge Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL051826001

Want to see what OC Duration looks like on a whole house? Try every color in our OC Duration color selector.

Materials installed, layer by layer

Owens Corning TruDefinition Duration uses SureNail Technology, a woven strip across the nailing zone that gives the fasteners something to grab and helps the shingle stay down in high wind. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • OC Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • OC ProEdge Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

The crew behind this roof

The crew came out of our St. Louis office. The job was opened in our system on May 18, 2026 and the crew finished on July 7, 2026, 50 days later. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Saint Charles?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Questions homeowners ask about this project

What shingle was installed on this Saint Charles roof?

Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.

How long did this project take from start to finish?

50 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

How big was the roof on Yankee Drive?

18.67 squares, or about 1,867 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

Who do I call about a roof in Saint Charles?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Saint Charles

Call 1-800-564-6232Free Inspection