At a glance: In short: 80.33 squares, IKO Dynasty, synthetic underlayment across the full deck, ridge vent, lifetime workmanship warranty. Cedar Plaza Parkway, St. Louis, MO 63128, done May 8, 2026 by our St. Louis crew (314-429-6000).
On Cedar Plaza Parkway in St. Louis, MO (south St. Louis County in the Sappington and Concord area), the crew tore off and replaced a very large 80.33-square project, about 8,033 square feet of roof and several times the size of an average house. It was the first of 2 roofs we've finished on Cedar Plaza Parkway in the past few months. On top: IKO Dynasty. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.
Project details
| Location | Cedar Plaza Parkway (St. Louis, MO 63128) |
|---|---|
| Completed | Friday, May 8, 2026 |
| Opened to completed | 154 days |
| Roof size | 80.33 squares (about 8,033 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | IKO — IKO Dynasty |
| Underlayment | JBI Synthetic |
| Ice & water | Alco Ice & Water |
| Starter course | IKO Starter |
| Hip & ridge | IKO Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL120525007 |
Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.
The roofing system on this house
With IKO Dynasty, the detail that matters most is the ArmourZone nailing strip: a wider, reinforced band where the nails go, so fasteners land where they hold best. The shingle is only the top layer. Here’s the full system that went on this house:
- Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
- Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
- IKO Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- IKO Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
- Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.
The crew behind this roof
The crew came out of our St. Louis office. The job was opened in our system on December 5, 2025 and the crew finished on May 8, 2026, 154 days later. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.
Need a roof in St. Louis?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
Common questions about this job
What shingle was installed on this St. Louis roof?
IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.
How long did this project take from start to finish?
154 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
How big was the roof on Cedar Plaza Parkway?
80.33 squares, or about 8,033 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.
Was ice and water shield installed?
Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
Who do I call about a roof in St. Louis?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.