At a glance: John Beal Roofing replaced the roof on Eunice Avenue in Webster Groves, MO 63119, finishing June 17, 2026. 15.67 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).
On Eunice Avenue in Webster Groves, MO (an inner-ring suburb known for older, larger homes and mature trees), the crew tore off and replaced a 15.67-square roof (1,567 square feet), about what a standard ranch house carries. We replaced 1 other roof in ZIP 63119 that same month. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and IKO Dynasty on top.
Project details
| Location | Eunice Avenue (Webster Groves, MO 63119) |
|---|---|
| Completed | Wednesday, June 17, 2026 |
| Opened to completed | 58 days |
| Roof size | 15.67 squares (about 1,567 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | IKO — IKO Dynasty |
| Underlayment | JBI Synthetic |
| Ice & water | Alco Ice & Water |
| Starter course | IKO Starter |
| Hip & ridge | IKO Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL042026015 |
Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.
The roofing system on this house
IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. The shingle is only the top layer. Here’s the full system that went on this house:
- Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
- Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
- IKO Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
- Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.
The crew behind this roof
John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (April 20, 2026) to the day the crew finished (June 17, 2026) took 58 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.
Need a roof in Webster Groves?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
Common questions about this job
What shingle was installed on this Webster Groves roof?
IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.
What kind of ventilation went on this roof?
A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.
How long did this project take from start to finish?
58 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Was ice and water shield installed?
Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
Who do I call about a roof in Webster Groves?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.