Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Eunice Avenue Roof Replacement

IKO Dynasty Roof Replacement — Webster Groves, MO 63119

A completed project on Eunice Avenue in Webster Groves, MO 63119 — 15.67 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Webster Groves
IKO DynastyIKO Dynasty · IKO · 15.67 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Eunice Avenue in Webster Groves, MO 63119, finishing June 17, 2026. 15.67 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

On Eunice Avenue in Webster Groves, MO (an inner-ring suburb known for older, larger homes and mature trees), the crew tore off and replaced a 15.67-square roof (1,567 square feet), about what a standard ranch house carries. We replaced 1 other roof in ZIP 63119 that same month. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and IKO Dynasty on top.

Project details

LocationEunice Avenue (Webster Groves, MO 63119)
CompletedWednesday, June 17, 2026
Opened to completed58 days
Roof size15.67 squares (about 1,567 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL042026015

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

The roofing system on this house

IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. The shingle is only the top layer. Here’s the full system that went on this house:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • IKO Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (April 20, 2026) to the day the crew finished (June 17, 2026) took 58 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Webster Groves?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Webster Groves roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

58 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

Who do I call about a roof in Webster Groves?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Webster Groves

Call 1-800-564-6232Free Inspection