At a glance: In short: 43.00 squares, OC Duration, synthetic underlayment across the full deck, ridge vent, lifetime workmanship warranty. Galahad Court, Weldon Spring, MO 63304, done October 22, 2026 by our St. Louis crew (314-429-6000).
Our crew finished a large 43.00-square roof covering about 4,300 square feet on Galahad Court in Weldon Spring, MO on Thursday, October 22. Weldon Spring is a St. Charles County city near the Missouri River bluffs and Busch Wildlife Area. We replaced 1 other roof in ZIP 63304 that same month. OC Duration went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.
Project record
| Location | Galahad Court (Weldon Spring, MO 63304) |
|---|---|
| Completed | Thursday, October 22, 2026 |
| Opened to completed | 42 days |
| Roof size | 43.00 squares (about 4,300 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | Owens Corning — OC Duration |
| Underlayment | JBI Synthetic |
| Ice & water | Ice & water membrane |
| Starter course | Factory starter |
| Hip & ridge | Owens Corning Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL091026012 |
Want to see what OC Duration looks like on a whole house? Try every color in our OC Duration color selector.
What went on this roof
Owens Corning TruDefinition Duration uses SureNail Technology, a woven strip across the nailing zone that gives the fasteners something to grab and helps the shingle stay down in high wind. The shingle is only the top layer. Here’s the full system that went on this house:
- A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
- Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
- Factory starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- Owens Corning Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
- Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.
The crew behind this roof
The crew came out of our St. Louis office. From the day the job was opened (September 10, 2026) to the day the crew finished (October 22, 2026) took 42 days. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. We answer the phone around the clock, storms included. See 24/7 emergency service.
Need a roof in Weldon Spring?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
FAQ about this roof
What shingle was installed on this Weldon Spring roof?
Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.
What kind of ventilation went on this roof?
A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.
Was ice and water shield installed?
Yes. Ice and water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
How long did this project take from start to finish?
42 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Who do I call about a roof in Weldon Spring?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

