Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Heege Road Roof Replacement

IKO Dynasty Roof Replacement — Affton, MO 63123

A completed project on Heege Road in Affton, MO 63123 — 18.00 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Affton
IKO DynastyIKO Dynasty · IKO · 18.00 squares · Roof replacement

At a glance: In short: 18.00 squares, IKO Dynasty, synthetic underlayment across the full deck, ridge vent, lifetime workmanship warranty. Heege Road, Affton, MO 63123, done May 9, 2026 by our St. Louis crew (314-429-6000).

Our crew finished a 18.00-square roof, right around the size of a typical single-story ranch on Heege Road in Affton, MO on Saturday, May 9. Affton is an unincorporated South County community just past the city limits. We replaced 1 other roof in ZIP 63123 that same month. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and IKO Dynasty on top.

What the work order shows

LocationHeege Road (Affton, MO 63123)
CompletedSaturday, May 9, 2026
Opened to completed68 days
Roof size18.00 squares (about 1,800 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL030226010

Choosing a color for your own roof? Browse every IKO Dynasty color on a whole-house preview in our IKO Dynasty color selector.

Materials installed, layer by layer

IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • IKO Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

This was a St. Louis office job, installed by our own crew, not subcontracted out. The job was opened in our system on March 2, 2026 and the crew finished on May 9, 2026, 68 days later. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Affton?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Affton roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

68 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Do you publish the customer's address?

No. We publish the street name, city and ZIP so you can see we really work in your neighborhood. We leave off the house number and never publish a customer's name.

Who do I call about a roof in Affton?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection