Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Beaverton Drive Roof Replacement

IKO Dynasty Roof Replacement — Bridgeton, MO 63044

A completed project on Beaverton Drive in Bridgeton, MO 63044 — 39.33 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Bridgeton
IKO DynastyIKO Dynasty · IKO · 39.33 squares · Roof replacement

At a glance: Completed July 7, 2026: a full tear-off and replacement on Beaverton Drive, Bridgeton, MO. Shingle: IKO Dynasty. Size: 39.33 squares. Underlayment: synthetic underlayment across the full deck. Office: St. Louis, 314-429-6000.

A large 39.33-square roof covering about 3,933 square feet on Beaverton Drive in Bridgeton, MO, a North County city bordering Lambert airport and the Missouri River. It was the first of 2 roofs we've finished on Beaverton Drive in the past few months. IKO Dynasty went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.

Project record

LocationBeaverton Drive (Bridgeton, MO 63044)
CompletedTuesday, July 7, 2026
Opened to completed74 days
Roof size39.33 squares (about 3,933 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL042426005

Choosing a color for your own roof? Browse every IKO Dynasty color on a whole-house preview in our IKO Dynasty color selector.

The roofing system on this house

With IKO Dynasty, the detail that matters most is the ArmourZone nailing strip: a wider, reinforced band where the nails go, so fasteners land where they hold best. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

Who did the work

John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (April 24, 2026) to the day the crew finished (July 7, 2026) took 74 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Bridgeton?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

FAQ about this roof

What shingle was installed on this Bridgeton roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How big was the roof on Beaverton Drive?

39.33 squares, or about 3,933 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

How long did this project take from start to finish?

74 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Bridgeton?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Bridgeton

Call 1-800-564-6232Free Inspection