Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Knollstone Drive Roof Replacement

Storm Cloud Roof Replacement — Ferguson, MO 63135

A completed project on Knollstone Drive in Ferguson, MO 63135 — 33.67 squares of OC Duration in Storm Cloud, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Ferguson
Storm CloudOC Duration · Owens Corning · 33.67 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Knollstone Drive in Ferguson, MO 63135, finishing May 16, 2026. 33.67 squares of Owens Corning OC Duration, color Storm Cloud, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

This one was a 33.67-square roof, the size of a larger ranch or a modest two-story on Knollstone Drive in Ferguson, MO, a North County city of established neighborhoods. It was one of 3 roof replacements our crews completed in Ferguson in May 2026. OC Duration in Storm Cloud went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.

What the work order shows

LocationKnollstone Drive (Ferguson, MO 63135)
CompletedSaturday, May 16, 2026
Opened to completed54 days
Roof size33.67 squares (about 3,367 sq ft)
Scope of workFull tear-off and roof replacement
Shingle colorStorm Cloud (as recorded on the work order)
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseOC Starter
Hip & ridgeOC ProEdge Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL032326019

The color on this roof

The work order lists the color as Storm Cloud. That name isn’t in our Owens Corning TruDefinition Duration color gallery, so we’re not showing a swatch that might be the wrong one. The image above is the shingle line itself. Your project manager can bring a full-size sample of any color out to your house. You can also browse every OC Duration color here.

Materials installed, layer by layer

The feature that defines Owens Corning Duration is SureNail Technology, a tough woven fabric band in the nailing zone that the fasteners go through for better hold. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • OC ProEdge Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

Who installed it

John Beal Roofing crews out of our St. Louis office installed this roof. From the day the job was opened (March 23, 2026) to the day the crew finished (May 16, 2026) took 54 days. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Ferguson?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Ferguson roof?

Owens Corning OC Duration in Storm Cloud, over synthetic underlayment across the full deck. The full system is in the project details table above.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

54 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

How big was the roof on Knollstone Drive?

33.67 squares, or about 3,367 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

Who do I call about a roof in Ferguson?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Ferguson

Call 1-800-564-6232Free Inspection