Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon South Clark Avenue Roof Replacement

IKO Dynasty Roof Replacement — Ferguson, MO 63135

A completed project on South Clark Avenue in Ferguson, MO 63135 — 17.33 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Ferguson
IKO DynastyIKO Dynasty · IKO · 17.33 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on South Clark Avenue in Ferguson, MO 63135, finishing May 17, 2026. 17.33 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

This one was a 17.33-square roof, right around the size of a typical single-story ranch on South Clark Avenue in Ferguson, MO, a North County city of established neighborhoods. It was one of 3 roof replacements our crews completed in Ferguson in May 2026. On top: IKO Dynasty. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

Project details

LocationSouth Clark Avenue (Ferguson, MO 63135)
CompletedSunday, May 17, 2026
Opened to completed9 days
Roof size17.33 squares (about 1,733 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL050826001

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

The roofing system on this house

Dynasty is IKO's performance architectural shingle. Its signature is ArmourZone, a reinforced fabric strip across the nailing area that gives every nail a wide, tough landing spot. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • IKO Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

John Beal Roofing crews out of our St. Louis office installed this roof. The job was opened in our system on May 8, 2026 and the crew finished on May 17, 2026, 9 days later. We’ve been family-owned since 1947. We run our own crews, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Ferguson?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

FAQ about this roof

What shingle was installed on this Ferguson roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

9 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Ferguson?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection