Get Your Ballpark Price
Home › Recent Projects › Kansas City North Lane Avenue Roof Replacement

OC Duration Roof Replacement — Kansas City, MO 64158

A completed project on North Lane Avenue in Kansas City, MO 64158 — 51.00 squares of Owens Corning OC Duration, installed by John Beal Roofing. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Kansas City
OC DurationOC Duration · Owens Corning · 51.00 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on North Lane Avenue in Kansas City, MO 64158, finishing October 4, 2026. 51.00 squares of Owens Corning OC Duration, installed over synthetic underlayment across the full deck. Handled by our Kansas City office (816-572-9500).

This one was a big 51.00-square roof, about 5,100 square feet of surface on North Lane Avenue in Kansas City, MO, the Northland, north of the Missouri River. It was one of 15 roof replacements our crews completed in Kansas City in October 2026. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and OC Duration on top.

Project record

LocationNorth Lane Avenue (Kansas City, MO 64158)
CompletedSunday, October 4, 2026
Opened to completed48 days
Roof size51.00 squares (about 5,100 sq ft)
Scope of workFull tear-off and roof replacement
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeOwens Corning Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberKC081726040

Choosing a color for your own roof? Browse every Owens Corning TruDefinition Duration color on a whole-house preview in our OC Duration color selector.

The roofing system on this house

Duration is Owens Corning's best-known architectural shingle. The engineered, woven SureNail strip across the nailing line is what sets it apart: it gives nails a defined target and grip. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
  • Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
  • IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • Owens Corning Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

Who installed it

The crew came out of our Kansas City office. The job was opened in our system on August 17, 2026 and the crew finished on October 4, 2026, 48 days later. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Kansas City?

Free inspection, documented slope by slope, no obligation. Kansas City office: 816-572-9500

Get My Free InspectionCall Kansas City — 816-572-9500

Common questions about this job

What shingle was installed on this Kansas City roof?

Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

Does John Beal Roofing work in Kansas City, MO?

Yes. Kansas City is served by our Kansas City office, and we've completed 22 roof replacements there in the last few months alone. Call 816-572-9500 for a free inspection.

How long did this project take from start to finish?

48 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Kansas City?

Our Kansas City office at 816-572-9500. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection