At a glance: John Beal Roofing replaced the roof on McKinley Avenue in Kirkwood, MO 63122, finishing October 1, 2026. 15.67 squares of Owens Corning OC Duration, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).
A 15.67-square roof, right around the size of a typical single-story ranch on McKinley Avenue in Kirkwood, MO, a West County suburb known for older, tree-lined neighborhoods. We replaced 1 other roof in ZIP 63122 that same month. OC Duration went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.
Project record
| Location | McKinley Avenue (Kirkwood, MO 63122) |
|---|---|
| Completed | Thursday, October 1, 2026 |
| Opened to completed | 10 days |
| Roof size | 15.67 squares (about 1,567 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | Owens Corning — OC Duration |
| Underlayment | JBI Synthetic |
| Ice & water | Ice & water membrane |
| Starter course | Factory starter |
| Hip & ridge | Owens Corning Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL092126005 |
Choosing a color for your own roof? Browse every Owens Corning TruDefinition Duration color on a whole-house preview in our OC Duration color selector.
The roofing system on this house
The feature that defines Owens Corning Duration is SureNail Technology, a tough woven fabric band in the nailing zone that the fasteners go through for better hold. The shingle is only the top layer. Here’s the full system that went on this house:
- Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
- Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
- Factory starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- Owens Corning Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
- Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.
The crew behind this roof
This was a St. Louis office job, installed by John Beal Roofing. The job was opened in our system on September 21, 2026 and the crew finished on October 1, 2026, 10 days later. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. We answer the phone around the clock, storms included. See 24/7 emergency service.
Need a roof in Kirkwood?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
Common questions about this job
What shingle was installed on this Kirkwood roof?
Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.
Was ice and water shield installed?
Yes. Ice and water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
How long did this project take from start to finish?
10 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Does John Beal Roofing work in Kirkwood, MO?
Yes. Kirkwood is served by our St. Louis office, and we've completed 4 roof replacements there in the last few months alone. Call 314-429-6000 for a free inspection.
Who do I call about a roof in Kirkwood?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

