At a glance: John Beal Roofing replaced the roof on Shumate Avenue in Maryland Heights, MO 63043, finishing June 23, 2026. 6.00 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).
Our crew finished a compact 6.00-square roof, about 600 square feet on Shumate Avenue in Maryland Heights, MO on Tuesday, June 23. Maryland Heights is a West County city along I-270, close to our headquarters. Crews closed it out on June 23, 2026. IKO Dynasty went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.
What the work order shows
| Location | Shumate Avenue (Maryland Heights, MO 63043) |
|---|---|
| Completed | Tuesday, June 23, 2026 |
| Opened to completed | 43 days |
| Roof size | 6.00 squares (about 600 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | IKO — IKO Dynasty |
| Underlayment | JBI Synthetic |
| Ice & water | Alco Ice & Water |
| Starter course | IKO Starter |
| Hip & ridge | IKO Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL051126014 |
Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.
The roofing system on this house
IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. The shingle is only the top layer. Here’s the full system that went on this house:
- Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
- Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
- IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
- IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
- Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.
Who did the work
This was a St. Louis office job, installed by our own crew, not subcontracted out. The job was opened in our system on May 11, 2026 and the crew finished on June 23, 2026, 43 days later. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.
Need a roof in Maryland Heights?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
FAQ about this roof
What shingle was installed on this Maryland Heights roof?
IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.
What kind of ventilation went on this roof?
A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.
Was ice and water shield installed?
Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
How long did this project take from start to finish?
43 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Who do I call about a roof in Maryland Heights?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.