OC Duration Roof Replacement — St. Louis, MO 63109

A completed project on Quincy Street in St. Louis, MO 63109 — 7.67 squares of OC Duration in OC Duration, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in St. Louis
OC DurationOC Duration · Owens Corning · 7.67 squares · Roof replacement

At a glance: Completed June 24, 2026: a full tear-off and replacement on Quincy Street, St. Louis, MO. Shingle: OC Duration. Size: 7.67 squares. Underlayment: synthetic underlayment across the full deck. Office: St. Louis, 314-429-6000.

On Quincy Street in St. Louis, MO (south city, in the St. Louis Hills and Princeton Heights area), the crew tore off and replaced a smaller 7.67-square roof covering roughly 767 square feet. It was one of 22 roof replacements our crews completed in St. Louis in June 2026. On top: Owens Corning Duration. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

What the work order shows

LocationQuincy Street (St. Louis, MO 63109)
CompletedWednesday, June 24, 2026
Opened to completed287 days
Roof size7.67 squares (about 767 sq ft)
Scope of workFull tear-off and roof replacement
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseOC Starter
Hip & ridgeOC ProEdge Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL091025013

Choosing a color for your own roof? Browse every Owens Corning TruDefinition Duration color on a whole-house preview in our OC Duration color selector.

The roofing system on this house

Owens Corning TruDefinition Duration uses SureNail Technology, a woven strip across the nailing zone that gives the fasteners something to grab and helps the shingle stay down in high wind. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
  • Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
  • OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • OC ProEdge Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

The crew behind this roof

This was a St. Louis office job, installed by our own crew, not subcontracted out. From the day the job was opened (September 10, 2025) to the day the crew finished (June 24, 2026) took 287 days. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in St. Louis?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this St. Louis roof?

Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.

How big was the roof on Quincy Street?

7.67 squares, or about 767 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

How long did this project take from start to finish?

287 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in St. Louis?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.