At a glance: In short: 47.33 squares, OC Duration, color Williamsburg Gray, synthetic underlayment across the full deck, ridge vent, lifetime workmanship warranty. Handom Place, Overland, MO 63114, done June 5, 2026 by our St. Louis crew (314-429-6000).
This one was a big 47.33-square roof, about 4,733 square feet of surface on Handom Place in Overland, MO, an inner-ring North County suburb along Page Avenue and I-170, where much of the housing dates to the postwar building boom. It was one of 3 roof replacements our crews completed in Overland in June 2026. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and OC Duration in Williamsburg Gray on top.
Project details
| Location | Handom Place (Overland, MO 63114) |
|---|---|
| Completed | Friday, June 5, 2026 |
| Opened to completed | 10 days |
| Roof size | 47.33 squares (about 4,733 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle color | Williamsburg Gray |
| Shingle | Owens Corning — OC Duration |
| Underlayment | JBI Synthetic |
| Ice & water | Alco Ice & Water |
| Starter course | OC Starter |
| Hip & ridge | OC ProEdge Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL052626027 |
See Williamsburg Gray on a whole house, plus every other Owens Corning TruDefinition Duration color, in our Owens Corning TruDefinition Duration color selector.
About the color: Williamsburg Gray
Williamsburg Gray is part of the OC Duration color lineup. Keep in mind a swatch is a starting point. On the roof, the color shifts with the angle of the sun, the pitch and what’s around it. It's a less common choice. Only 2 of our recent projects used it. That’s why we bring full-size samples out and hold them up against the house in daylight.
The roofing system on this house
Duration is Owens Corning's best-known architectural shingle. The engineered, woven SureNail strip across the nailing line is what sets it apart: it gives nails a defined target and grip. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:
- Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
- Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
- OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- OC ProEdge Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
- Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.
The crew behind this roof
This was a St. Louis office job, installed by our own crew, not subcontracted out. The job was opened in our system on May 26, 2026 and the crew finished on June 5, 2026, 10 days later. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.
Need a roof in Overland?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
Questions homeowners ask about this project
What shingle was installed on this Overland roof?
Owens Corning OC Duration in Williamsburg Gray, over synthetic underlayment across the full deck. The full system is in the project details table above.
Does John Beal Roofing work in Overland, MO?
Yes. Overland is served by our St. Louis office, and we've completed 5 roof replacements there in the last few months alone. Call 314-429-6000 for a free inspection.
Was ice and water shield installed?
Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
How long did this project take from start to finish?
10 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Who do I call about a roof in Overland?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

