At a glance: Completed September 22, 2026: a full tear-off and replacement on Barkman Drive, St. Louis, MO. Shingle: OC Duration. Size: 24.67 squares. Underlayment: two layers of synthetic underlayment, a heavier spec than our standard single layer. Office: St. Louis, 314-429-6000.
On Barkman Drive in St. Louis, MO (west St. Louis County near Maryland Heights, a few minutes from our headquarters), the crew tore off and replaced a 24.67-square roof, the size of a larger ranch or a modest two-story. It was one of 27 roof replacements our crews completed in St. Louis in September 2026. The system: two layers of synthetic underlayment, a heavier spec than our standard single layer, ice and water membrane in the valleys and at the eaves, and OC Duration on top.
Project details
| Location | Barkman Drive (St. Louis, MO 63146) |
|---|---|
| Completed | Tuesday, September 22, 2026 |
| Opened to completed | 29 days |
| Roof size | 24.67 squares (about 2,467 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | Owens Corning — OC Duration |
| Underlayment | JBI Synthetic, double layer |
| Ice & water | Alco Ice & Water |
| Starter course | OC Starter |
| Hip & ridge | OC ProEdge Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | STL082426004 |
Want to see what OC Duration looks like on a whole house? Try every color in our OC Duration color selector.
The roofing system on this house
Owens Corning TruDefinition Duration uses SureNail Technology, a woven strip across the nailing zone that gives the fasteners something to grab and helps the shingle stay down in high wind. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:
- Two layers of synthetic underlayment. That’s double our standard spec. The second layer adds another barrier under the shingles.
- Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
- OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
- OC ProEdge Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
- Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.
Who did the work
The crew came out of our St. Louis office. The job was opened in our system on August 24, 2026 and the crew finished on September 22, 2026, 29 days later. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.
Need a roof in St. Louis?
Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000
FAQ about this roof
What shingle was installed on this St. Louis roof?
Owens Corning OC Duration, over two layers of synthetic underlayment, a heavier spec than our standard single layer. The full system is in the project details table above.
How big was the roof on Barkman Drive?
24.67 squares, or about 2,467 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.
What kind of ventilation went on this roof?
A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.
Was ice and water shield installed?
Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.
Who do I call about a roof in St. Louis?
Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

