Get Your Ballpark Price
Home › Recent Projects › St Louis Towne Woods Drive Roof Replacement

GAF Timberline HDZ Roof Replacement — St. Louis, MO 63129

A completed project on Towne Woods Drive in St. Louis, MO 63129 — 26.67 squares of GAF GAF Timberline HDZ, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

GAF Timberline HDZ shingle line as installed in St. Louis
GAF Timberline HDZGAF Timberline HDZ · GAF · 26.67 squares · Roof replacement

At a glance: Completed September 21, 2026: a full tear-off and replacement on Towne Woods Drive, St. Louis, MO. Shingle: GAF Timberline HDZ. Size: 26.67 squares. Underlayment: synthetic underlayment across the full deck. Office: St. Louis, 314-429-6000.

This one was a 26.67-square roof, the size of a larger ranch or a modest two-story on Towne Woods Drive in St. Louis, MO, south St. Louis County in Oakville. It was one of 27 roof replacements our crews completed in St. Louis in September 2026. On top: GAF Timberline HDZ. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

Job specs

LocationTowne Woods Drive (St. Louis, MO 63129)
CompletedMonday, September 21, 2026
Opened to completed84 days
Roof size26.67 squares (about 2,667 sq ft)
Scope of workFull tear-off and roof replacement
ShingleGAF — GAF Timberline HDZ
UnderlaymentJBI Synthetic
Ice & waterIce & water membrane
Starter courseFactory starter
Hip & ridgeGAF Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL062926050

Want to see what GAF Timberline HDZ looks like on a whole house? Try every color in our GAF Timberline HDZ color selector.

What went on this roof

Timberline HDZ is GAF's architectural shingle with a wide StrikeZone nailing area and LayerLock Technology holding the two layers of the shingle together, so fasteners land where they hold best. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • Factory starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
  • GAF Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

The crew came out of our St. Louis office. The job was opened in our system on June 29, 2026 and the crew finished on September 21, 2026, 84 days later. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in St. Louis?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

FAQ about this roof

What shingle was installed on this St. Louis roof?

GAF GAF Timberline HDZ, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Ice and water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

How long did this project take from start to finish?

84 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Does John Beal Roofing work in St. Louis, MO?

Yes. St. Louis is served by our St. Louis office, and we've completed 102 roof replacements there in the last few months alone. Call 314-429-6000 for a free inspection.

Do you publish the customer's address?

No. We publish the street name, city and ZIP so you can see we really work in your neighborhood. We leave off the house number and never publish a customer's name.

Who do I call about a roof in St. Louis?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection