Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Blandford Drive Roof Replacement

IKO Dynasty Roof Replacement — St. Louis, MO 63121

A completed project on Blandford Drive in St. Louis, MO 63121 — 12.67 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in St. Louis
IKO DynastyIKO Dynasty · IKO · 12.67 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Blandford Drive in St. Louis, MO 63121, finishing July 8, 2026. 12.67 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

A smaller 12.67-square roof covering roughly 1,267 square feet on Blandford Drive in St. Louis, MO, north St. Louis County around Normandy. It was one of 24 roof replacements our crews completed in St. Louis in July 2026. On top: IKO Dynasty. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

Job specs

LocationBlandford Drive (St. Louis, MO 63121)
CompletedWednesday, July 8, 2026
Opened to completed47 days
Roof size12.67 squares (about 1,267 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL052226003

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

What went on this roof

IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • IKO Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

Who installed it

The crew came out of our St. Louis office. From the day the job was opened (May 22, 2026) to the day the crew finished (July 8, 2026) took 47 days. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in St. Louis?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Questions homeowners ask about this project

What shingle was installed on this St. Louis roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

Does John Beal Roofing work in St. Louis, MO?

Yes. St. Louis is served by our St. Louis office, and we've completed 75 roof replacements there in the last few months alone. Call 314-429-6000 for a free inspection.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

47 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in St. Louis?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near St. Louis

Call 1-800-564-6232Free Inspection