Local Offices St. Louis · Kansas City · Indianapolis · Springfield · Columbia / Jefferson City · Lake of the Ozarks · Southern Illinois
Get Your Ballpark Price
Home › Recent Projects › O Fallon Toddy Avenue Roof Replacement

IKO Dynasty Roof Replacement — St. Louis, MO 63114

A completed project on Toddy Avenue in St. Louis, MO 63114 — 14.00 squares of OC Duration in IKO Dynasty, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in St. Louis
IKO DynastyIKO Dynasty · IKO · 14.00 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Toddy Avenue in St. Louis, MO 63114, finishing July 8, 2026. 14.00 squares of IKO IKO Dynasty, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

On Toddy Avenue in St. Louis, MO (north St. Louis County around Overland), the crew tore off and replaced a 14.00-square roof (1,400 square feet), about what a standard ranch house carries. It was one of 24 roof replacements our crews completed in St. Louis in July 2026. IKO Dynasty went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.

Job specs

LocationToddy Avenue (St. Louis, MO 63114)
CompletedWednesday, July 8, 2026
Opened to completed15 days
Roof size14.00 squares (about 1,400 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseIKO Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL062326019

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

The roofing system on this house

IKO Dynasty is a laminated architectural shingle built around a wide reinforced nailing strip IKO calls ArmourZone, which gives the installer a generous target and holds the fasteners where they belong. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
  • Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
  • IKO Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • IKO Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

Who did the work

This was a St. Louis office job, installed by our own crew, not subcontracted out. From the day the job was opened (June 23, 2026) to the day the crew finished (July 8, 2026) took 15 days. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in St. Louis?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Questions homeowners ask about this project

What shingle was installed on this St. Louis roof?

IKO IKO Dynasty, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

How big was the roof on Toddy Avenue?

14.00 squares, or about 1,400 square feet of roof surface. A roofing square is 100 square feet. Roofs are measured and priced that way, not by the square footage of the floor plan.

How long did this project take from start to finish?

15 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in St. Louis?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near St. Louis

Call 1-800-564-6232Free Inspection