Get Your Ballpark Price
Home › Recent Projects › Wood River Conley Avenue Roof Replacement

Storm Cloud Roof Replacement — Wood River, IL 62095

A completed project on Conley Avenue in Wood River, IL 62095 — 10.67 squares of Owens Corning OC Duration in Storm Cloud, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Wood River
Storm CloudOC Duration · Owens Corning · 10.67 squares · Roof replacement

At a glance: Completed September 12, 2026: a full tear-off and replacement on Conley Avenue, Wood River, IL. Shingle: OC Duration, color Storm Cloud. Size: 10.67 squares. Underlayment: synthetic underlayment across the full deck. Office: St. Louis, 314-429-6000.

This one was a compact 10.67-square roof, about 1,067 square feet on Conley Avenue in Wood River, IL, a Madison County city along the Mississippi just south of Alton. It was our only Wood River roof of September. On top: Owens Corning Duration in Storm Cloud. Underneath: synthetic underlayment across the full deck plus ice and water membrane where water collects.

Project record

LocationConley Avenue (Wood River, IL 62095)
CompletedSaturday, September 12, 2026
Opened to completed93 days
Roof size10.67 squares (about 1,067 sq ft)
Scope of workFull tear-off and roof replacement
Shingle colorStorm Cloud (as recorded on the work order)
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterAlco Ice & Water
Starter courseOC Starter
Hip & ridgeOC ProEdge Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL061126022

The color on this roof

The work order lists the color as Storm Cloud. That name isn’t in our Owens Corning TruDefinition Duration color gallery, so we’re not showing a swatch that might be the wrong one. The image above is the shingle line itself. Your project manager can bring a full-size sample of any color out to your house. You can also browse every OC Duration color here.

Materials installed, layer by layer

Owens Corning TruDefinition Duration uses SureNail Technology, a woven strip across the nailing zone that gives the fasteners something to grab and helps the shingle stay down in high wind. The shingle is only the top layer. Here’s the full system that went on this house:

  • A full layer of synthetic underlayment. It’s the backup water barrier under the shingles, and it holds up to foot traffic and wind far better than paper felt.
  • Self-sealing ice and water membrane where water concentrates. It seals around every nail driven through it, which matters in valleys and at the eaves.
  • OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • OC ProEdge Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

This was a St. Louis office job, installed by our own crew, not subcontracted out. From the day the job was opened (June 11, 2026) to the day the crew finished (September 12, 2026) took 93 days. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Wood River?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Wood River roof?

Owens Corning OC Duration in Storm Cloud, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Alco Ice & Water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

What color is the roof on Conley Avenue?

Storm Cloud, from the OC Duration line. It's listed as recorded on the work order.

How long did this project take from start to finish?

93 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Wood River?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Nearby completed projects

Call 1-800-564-6232Free Inspection