At a glance: In short: 31.67 squares, OC Duration, synthetic underlayment across the full deck, ridge vent, lifetime workmanship warranty. Northwest Rosaceae Drive, Blue Springs, MO 64015, done October 18, 2026 by our Kansas City crew (816-572-9500).
On Northwest Rosaceae Drive in Blue Springs, MO (an eastern Jackson County suburb of Kansas City), the crew tore off and replaced a 31.67-square roof, the size of a larger ranch or a modest two-story. It was our only Blue Springs roof of October. OC Duration went over synthetic underlayment across the full deck, with ice and water membrane at the eaves and valleys.
What the work order shows
| Location | Northwest Rosaceae Drive (Blue Springs, MO 64015) |
|---|---|
| Completed | Sunday, October 18, 2026 |
| Opened to completed | 59 days |
| Roof size | 31.67 squares (about 3,167 sq ft) |
| Scope of work | Full tear-off and roof replacement |
| Shingle | Owens Corning — OC Duration |
| Underlayment | JBI Synthetic |
| Ice & water | Alco Ice & Water |
| Starter course | IKO Starter |
| Hip & ridge | Owens Corning Hip & Ridge |
| Ventilation | Lomanco Omni Roll ridge vent |
| Warranty | Lifetime workmanship warranty |
| Project number | KC082026010 |
Want to see what OC Duration looks like on a whole house? Try every color in our OC Duration color selector.
Materials installed, layer by layer
The feature that defines Owens Corning Duration is SureNail Technology, a tough woven fabric band in the nailing zone that the fasteners go through for better hold. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:
- Synthetic underlayment over the whole deck. It’s stronger and more tear-resistant than felt, and it lies flat if weather rolls in during the tear-off.
- Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
- IKO Starter strip along every edge. The first course is where wind gets under a roof. A factory starter with its own sealant line locks it down.
- Owens Corning Hip & Ridge on the hips and peak. Matching cap shingles made for the job, not field shingles cut into pieces.
- Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.
Who did the work
John Beal Roofing crews out of our Kansas City office installed this roof. The job was opened in our system on August 20, 2026 and the crew finished on October 18, 2026, 59 days later. We’ve been family-owned since 1947, and every roof comes with our lifetime workmanship warranty on top of the manufacturer’s material coverage. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.
Need a roof in Blue Springs?
Free inspection, documented slope by slope, no obligation. Kansas City office: 816-572-9500
Common questions about this job
What shingle was installed on this Blue Springs roof?
Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.
How long did this project take from start to finish?
59 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.
Does John Beal Roofing work in Blue Springs, MO?
Yes. Blue Springs is served by our Kansas City office, and we've completed 3 roof replacements there in the last few months alone. Call 816-572-9500 for a free inspection.
What kind of ventilation went on this roof?
A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.
Who do I call about a roof in Blue Springs?
Our Kansas City office at 816-572-9500. A person answers 24 hours a day, including nights, weekends and holidays.

