Get Your Ballpark Price
Home › Recent Projects › Maryland Heights Bennington Court Roof Replacement

IKO Dynasty Roof Replacement — Maryland Heights, MO 63043

A completed project on Bennington Court in Maryland Heights, MO 63043 — 23.67 squares of IKO IKO Dynasty, installed by John Beal Roofing. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

IKO Dynasty shingle line as installed in Maryland Heights
IKO DynastyIKO Dynasty · IKO · 23.67 squares · Roof replacement

At a glance: In short: 23.67 squares, IKO Dynasty, two layers of synthetic underlayment, a heavier spec than our standard single layer, ridge vent, lifetime workmanship warranty. Bennington Court, Maryland Heights, MO 63043, done October 6, 2026 by our St. Louis crew (314-429-6000).

A mid-size 23.67-square roof, roughly 2,367 square feet on Bennington Court in Maryland Heights, MO, a West County city along I-270, close to our headquarters. Crews closed it out on October 6, 2026. The system: two layers of synthetic underlayment, a heavier spec than our standard single layer, ice and water membrane in the valleys and at the eaves, and IKO Dynasty on top.

Project details

LocationBennington Court (Maryland Heights, MO 63043)
CompletedTuesday, October 6, 2026
Opened to completed327 days
Roof size23.67 squares (about 2,367 sq ft)
Scope of workFull tear-off and roof replacement
ShingleIKO — IKO Dynasty
UnderlaymentJBI Synthetic, double layer
Ice & waterAlco Ice & Water
Starter courseOC Starter
Hip & ridgeIKO Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL111325009

Want to see what IKO Dynasty looks like on a whole house? Try every color in our IKO Dynasty color selector.

The roofing system on this house

Dynasty is IKO's performance architectural shingle. Its signature is ArmourZone, a reinforced fabric strip across the nailing area that gives every nail a wide, tough landing spot. People shop for the shingle, but what’s underneath it and how the edges are finished decide how long the roof lasts. On this job:

  • Two layers of synthetic underlayment. That’s double our standard spec. The second layer adds another barrier under the shingles.
  • Ice and water membrane at the eaves and in the valleys. This self-adhering layer goes where water backs up: behind ice dams at the eaves and where two slopes meet.
  • OC Starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • IKO Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. Continuous exhaust at the peak. Together with the soffit intake, it moves heat and moisture out of the attic.

Who did the work

This was a St. Louis office job, installed by John Beal Roofing. The job was opened in our system on November 13, 2025 and the crew finished on October 6, 2026, 327 days later. Family-owned since 1947, we back every replacement with a lifetime workmanship warranty. If a storm opens up a roof at 2 a.m., someone answers the phone. See 24/7 emergency service.

Need a roof in Maryland Heights?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

Common questions about this job

What shingle was installed on this Maryland Heights roof?

IKO IKO Dynasty, over two layers of synthetic underlayment, a heavier spec than our standard single layer. The full system is in the project details table above.

Does John Beal Roofing work in Maryland Heights, MO?

Yes. Maryland Heights is served by our St. Louis office, and we've completed 6 roof replacements there in the last few months alone. Call 314-429-6000 for a free inspection.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

327 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Maryland Heights?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.