Get Your Ballpark Price
Home › Recent Projects › Webster Groves Lee Avenue Roof Replacement

OC Duration Roof Replacement — Webster Groves, MO 63119

A completed project on Lee Avenue in Webster Groves, MO 63119 — 11.00 squares of Owens Corning OC Duration, installed by our own crews. Street name and ZIP only; we never publish a customer’s house number.

See what your roof needs

Free inspection, documented slope by slope. No obligation.

We never sell your information. A local project manager will call you back.

OC Duration shingle line as installed in Webster Groves
OC DurationOC Duration · Owens Corning · 11.00 squares · Roof replacement

At a glance: John Beal Roofing replaced the roof on Lee Avenue in Webster Groves, MO 63119, finishing September 30, 2026. 11.00 squares of Owens Corning OC Duration, installed over synthetic underlayment across the full deck. Handled by our St. Louis office (314-429-6000).

On Lee Avenue in Webster Groves, MO (an inner-ring suburb known for older, larger homes and mature trees), the crew tore off and replaced a smaller 11.00-square roof covering roughly 1,100 square feet. It was one of 3 roof replacements our crews completed in Webster Groves in September 2026. The system: synthetic underlayment across the full deck, ice and water membrane in the valleys and at the eaves, and OC Duration on top.

Project record

LocationLee Avenue (Webster Groves, MO 63119)
CompletedWednesday, September 30, 2026
Opened to completed10 days
Roof size11.00 squares (about 1,100 sq ft)
Scope of workFull tear-off and roof replacement
ShingleOwens Corning — OC Duration
UnderlaymentJBI Synthetic
Ice & waterIce & water membrane
Starter courseFactory starter
Hip & ridgeOwens Corning Hip & Ridge
VentilationLomanco Omni Roll ridge vent
WarrantyLifetime workmanship warranty
Project numberSTL092026004

Want to see what OC Duration looks like on a whole house? Try every color in our OC Duration color selector.

What went on this roof

Duration is Owens Corning's best-known architectural shingle. The engineered, woven SureNail strip across the nailing line is what sets it apart: it gives nails a defined target and grip. Every one of our replacements is a system, not just shingles. On this roof, from the deck up:

  • Synthetic underlayment, edge to edge. It doesn’t wrinkle or tear like felt, and it keeps the deck dry if a shower pops up mid-job.
  • Ice and water shield in the valleys and along the eaves. Those are the two places a Midwest roof takes on water first, from ice dams in January and heavy runoff in spring storms.
  • Factory starter at the eaves and rakes. It’s a purpose-made starter strip with factory adhesive, not cut-up field shingles, so the edges stay sealed.
  • Owens Corning Hip & Ridge cap. Pre-formed cap that seals the hips and ridge.
  • Lomanco Omni Roll ridge vent. It runs along the peak and lets hot, damp attic air escape. That protects the decking and keeps shingles from baking from below.

The crew behind this roof

The crew came out of our St. Louis office. The job was opened in our system on September 20, 2026 and the crew finished on September 30, 2026, 10 days later. John Beal Roofing has been family-run since 1947, and our lifetime workmanship warranty covers the installation for as long as you own the home. We answer the phone around the clock, storms included. See 24/7 emergency service.

Need a roof in Webster Groves?

Free inspection, documented slope by slope, no obligation. St. Louis office: 314-429-6000

Get My Free InspectionCall St. Louis — 314-429-6000

FAQ about this roof

What shingle was installed on this Webster Groves roof?

Owens Corning OC Duration, over synthetic underlayment across the full deck. The full system is in the project details table above.

Was ice and water shield installed?

Yes. Ice and water membrane went in the valleys and along the eaves, the spots where water backs up or collects first.

What kind of ventilation went on this roof?

A Lomanco Omni Roll ridge vent along the peak. Paired with soffit intake, it lets hot, moist attic air escape.

How long did this project take from start to finish?

10 days from the day the job was opened to the day the crew finished. Most of that time is scheduling, material ordering and any insurance paperwork. The tear-off and install usually take a day or two on a house this size.

Who do I call about a roof in Webster Groves?

Our St. Louis office at 314-429-6000. A person answers 24 hours a day, including nights, weekends and holidays.

Other roofs we replaced near Webster Groves

Call 1-800-564-6232Free Inspection